Close
Search for: Go

Contact NCC

Headquarter

SE-170 80 Solna
Visit: Vallgatan 3
Tel: +46 8 585 510 00
Fax: +46 8 85 77 75
Registered Office: Solna
Reg.No: 556034-5174

Invoice adress

NCC "[company]"
205 79 Malmö
 Organisation numbers

Other contacts

NCC CONSTRUCTION SWEDEN AB

SE 170 80 Solna
Vallgatan 3
Tel: +46 8 585 510 00

NCC property development AB

SE 170 80 Solna
Vallgatan 3
Tel: +46 8 585 510 00
Fax: +46 8 85 54 11

NCC roads AB

SE 170 80 Solna
Vallgatan 3
Tel: +46 8 585 510 00
Fax: +46 8 585 523 58

Citytunneln

Citytunneln

NCC constructs Malmö C Nedre Station for Citytunnel in Malmö

NCC constructs Malmö C Nedre Station for Citytunnel in Malmö

The Citytunnel is a transport solution that will connect the railway line to the north of Malmö with the railway line to Trelleborg, Ystad and Copenhagen.

NCC’s assignments for the Citytunnel include Malmö C nedre, the new station section at central station. Part of the assignment is a platform that connects the existing railway station to an underground station section directly joined to Malmö C station and a new switchbox, where the two TBM tunnels meet.

The entire project will be constructed in an open pit with temporary supporting structures in the form of sheet piles and slotted walls. The work site is 900 meters long in total. Work is divided into phases, since traffic must always be able to pass in a north-south direction.

Approximately 15,000 tons of reinforcement and 120,000 cubic meters of concrete will be used in the permanent structures. To ensure that the work is as efficient as possible, about 80 percent of the reinforcing cages are prefabricated indoors and subsequently lifted into place in the pit, where the final work is performed.

Infiltration of groundwater is arranged so that groundwater levels outside the sealing membrane are safeguarded. This is done to minimize settling of buildings and other installations in the immediate surroundings. Excess earth from the pit, approximately 300,000 cubic meters, will be transported to Norra Hamnen harbor in Malmö and be used for filling.

  • Project: Platform, underground station and TBM chamber.
  • Customer: Swedish Rail Administration through the Citytunnel project
  • Construction period: March 2005 – April 2009
  • Principle contractor: NCC Construction Sverige AB.    

More information

Karin Forsvall
Tel:040-31 70 48