NCC’s goal is to have the highest production efficiency in the industry

The key factors for increasing productivity are

  • having an adapted organization
  • conducting efficient purchasing
  • utilizing the opportunities presented by industrial construction
  • maintaining effective project control.

Purchasing

The construction process involves an extensive flow of materials, and approximately 65 percent of the NCC
Group’s costs are related to purchasing. NCC’s goal is to have the industry’s lowest purchasing costs. This is to be achieved by continuing to work on coordinating purchasing volumes, increasing the proportion of international purchasing and developing the purchasing operations together with selected suppliers. High quality, environmental commitment and social responsibility are self-evident parameters that impact on the selection of materials and suppliers.

Project control

NCC’s greatest opportunities and risks lie in its project control. The success of both major and minor projects largely derives from planning, management, control and follow-up. One crucial factor for the success of a project is human expertise, more specifi cally leadership. Experience indicates that project losses are often caused by insufficient project control. NCC has developed its own
model for the control and follow-up of major projects. Since efficient purchasing, platforms and competence
centers strengthen project control by enabling greater control of all elements in the construction process, continuous improvement work is a prioritized issue.

Industrial construction

For several years, NCC has worked on industrializing the construction process in various ways. The first step is to think more industrially as early as the project engineering phase through design, planning and logistics – what we call technical platforms.

Through design, economies of scale can be achieved, as can volumes in the purchasing process. Planning is a prerequisite for an industrialized process and, in major projects for example, logistical solutions are critical for the project to be implemented at all.

Technical platforms are used in various parts of the Group for apartment blocks, singlefamily homes, offices and logistics buildings. Specialized platforms are also used in the production of bridges, indoor sports arenas, bathrooms and engineered services cores.